Haymes Brothers, Inc. Projects
Click On The Picture To View More

*** PLEASE CHECK BACK SOON FOR UPDATES ***


Greystone Thoroughfare Phase 3 Morrisville Parkway Pedestrian Tunnel
and headwalls for 66" & 72" concrete pipe
Morrisville, North Carolina

Project Description:

225 Linear foot 10' x 12' pedestrian tunnel.   Cast in place headwalls for 66" and 72" concrete pipe.

Project Cost: $270,000

Owner:  Barnhill Contracting Company

Culvert Construction to replace Bridge #13 over Troublesome Creek
Rockingham County, North Carolina

North Carolina Dept. of Transportation

Project Description:

Demolition of existing timber deck bridge and concrete abutments.   Construction of triple barrel culvert approximately 40' x 50' x 14'.   Re-grade road placing stone and asphalt to tie in with existing roadway.   Install and maintain all erosion and traffic controls.

Project Cost: $500,000

Owner:  North Carolina Dept. of Transportation






Rocky Pen Reservoir Dam Construction

Stafford County, VA

Project Description:

This project consists the excavation and placement of approximately 1,000,000 CY of zoned embankment placement for the construction of the Rocky Pen Run Reservoir Dam.  The project also includes the construction of a pump station and 36 inch raw water line to service the Rocky Pen Run Water Treatment Plant. This reservoir will have a surface area of greater than 600 acres.

Project Cost: $33,500,000

Design Engineer: URS Corporation

Project Engineer:  Schnabel Engineering

Major Subcontractors: ASI Constructors and MEB General Contractors

Owner:  Stafford County




Rocky Pen Reservoir Water Treatment Plant Site Work

Stafford County, VA

Project Description:

The Rocky Pen Run Reservoir Water Treatment Plant is an integral portion of the Rocky Pen Run Reservoir and MEB General Contractors chose Haymes Brothers to complete site work for them.

Project Cost: $1,000,000

Design Engineer: CH2M Hill

Owner:  Stafford County



Rocky Pen Reservoir Borrow Area #9

Stafford County, VA

Project Description:

This project consisted of stockpiling core material for the future Rocky Pen Run Reservoir Dam. This reservoir will have a surface area of greater than 600 acres.

Project Cost: $1,000,000

Design Engineer: URS Corporation

Project Engineer:  Schnabel Engineering

Owner:  Stafford County


  US 15, Route 786, and Route 628 Roadway Improvements
Farmville, VA

Project Description:

Addition of turn lanes and signal improvments on US 15, construct approximately 1 mile of new roadway (route 786), and install necesarry storm drain and erosion control measures.

Project Cost: $2,565,000

Owner: Prince Edward County

  Ringgold East Graded Pads and Gas Line
Ringgold, VA


Project Description:

This project consisted of clearing approximately 20 acres, moving 200,000 CY of dirt, grading two building pads, installation of storm drain and associated erosion control measures. 

Project Cost $1,234,000

Owner:  Pittsylvania County



Lakeside Drive Shopping Plaza Site Project
Lynchburg, VA


Project Description:

This project consisted of clearing, grading, utility installation, site concrete, construction of an underground storm water dentention system, and paving of parking area for a new shopping center. Approximately 40,000CY of dirt was moved and 7,500 liner feet of pipe was installed.

Project Cost: $2,200,000

Peters Creek Streambank Slope Stabilization
Roanoke, VA

Project Description:

Installation of a mass gravity block wall, riprap, and associated work near the intersection of Peters Creek Road and Melrose Avenue.

Project Cost: $295,000

Owner: City of Roanoke, VA

Superstructure Replacment
Tripple Creek Road over Route 220 Bypass
Rocky Mount, VA


Project Description:

Remove and replace single lane bridge deck that spanned over highway 220.   Existing and replacement structure consisted of pre-cast concrete slabs. 

Project Cost: $667,000

Project Owner: Virginia Department of Transportation

Replace Bridge #6 over Panther Creek on Eygpt Rd
Prospect Hill, NC

Project Description:

Demolition and removal of existing timber deck and wooden abutments.  Installation of new form and pour concrete abutments, pre-cast concrete bridge beams, form and pour concrete guard rails, and new asphalt tie-ins.

Project Cost: $404,000

Owner: North Carolina Department of Transportation 





Bluestone Regional Business and Technology Center
Tazewell County, VA


Project Description:

This project cfor the Tazewell County Industrial Development Authority consited of clearing, grubbing, water, sewer, roadways, building pads, a water punp station and 250,000 gallon water storage tank.

Project Cost: $6,000,000

Design Engineer:  Thompson & litton

Owner:  Tazewell County Industrial Development Authority




Liberty University Intramural Fields
Lynchburg, VA


Project Description:

This project consisted of the clearing, mass grading and fine grading of a 40 acre pad site for Liberty University and the associated erosion control and storm drainage.  It also included the installation of an entrance road off of Candler's Mountain Road and had approximately 60,000 CY of cut to fill.

Project Cost: $1,000,000

Design Engineer:  Hurt & Proffitt

Owner:  Liberty University




Pittsylvania County Sanitary Landfill, Phase II - Cell B
Chatham, VA


Project Description:

Construction of a new 9 acre municipal sanitary landfill cell.  Turn key project that included the excavation, grading, drainage, liner, leachate collection system, and access road construction and overlay

Project Cost: $1,925,000

Design Engineer: Dewberry

Owner: Pittsylvania County, VA

 
Liberty University Candler's Mountain Road Satellite Parking Lot

Lynchburg, VA

Project Description:

This project completed for Liberty University created an 11 acre pad for future use.   The pad is currently being used for parking.   Approximately 27 acres were cleared, 175,000 cubic yards of dirt moved, and erosion controls installed.

Project Cost: $739,000

Design Engineer:

Owner:  Liberty University


Kinderton Technology Campus Water and Sewer Extension

Clarksville, VA

Project Description:

This project for the Industrial Development Authority of Mecklenburg County created 2 pads for future development.   Approximately 67 acres were cleared, 250,000 cubic yards of dirt moved, 5,000 linear feet of utilities placed, and erosion controls installed.

Project Cost: $1,395,000

Project Engineer:  Hurt & Proffitt

Owner: 


Riverstone Technology Park - Lot Development

South Boston, VA

Project Description:

This project for the Industrial Development Authority of Halifax County created 4 pads for future development.   Approximately 80 acres were cleared, 218,000 cubic yards of dirt was moved, and erosion controls were installed.

Project Cost: $923,000




 


Deep Creek Watershed Dam 5D
Yadkin County, NC

Project Description:

This project consisted of 500,000 CY of excavation along with foundation preparation, and installation of a Roller Compacted Concrete Dam. Groundbreaking was held on November 25, 2008, check back often for updated photographs and information on this project.

Project Cost: $17 Million

Design Engineer: Schnabel Engineering

Major Subcontractors: ASI Constructors, Lane Geo-Construction, Colorado Instrumentation




Under

Construction

Yadkinville Water Treatment Plant Reservoir

Yadkinville, NC

Project Description:

This project for the Town of Yadkinville, NC is for the construction of a dam reservoir with a raw water intake and 2.500 linear foot of water line to supply a new pump station for the town.

Project Cost: $600,000.00

Design Engineer:  Hobbs-Upchurch

Owner: Town of Yadkinville, NC





RTI International Metals

Martinsville, VA

Project Description:

Located in the Patriot Industrial Center in Henry County, RTI contracted with Haymes Brothers to perform 800,000 CY of excavation on a very demanding schedule.  The project was delivered ahead of schedule with the mass excavation being completed in less than 6 months.

Project Cost: $7 Million

Design Engineer:

Owner:  RTI International Metals





Bridge Replacement over the Maury River
VDOT Project Number A50 - Rockbridge County, VA

Project Description:

This project is for the replacement of a bridge over the Maury River.  Check back soon for information about the drill shafts and other information about this challenging project.


Project Cost: $11.4 Million

Project Owner and Engineer:  VDOT



Under Construction

Timber Ridge Apartments - Phase II

Lynchburg, VA

Project Description:

Grading and site utilities for a multi residential development in Lynchburg, VA for PEDCOR Company.  A very compact site and hilly terrain required the installation of multiple retaining walls on the site in order to complete the grading operations and deliver the building pads. 

Project Cost: $3 Million

Liberty University Perimeter Road
Lynchburg, VA

Project Description:
This project consists of the grading approximately 1 mile of a new perimeter access road for Liberty University.

Project Cost: $1.4 Million




Timber Ridge Apartments - Phase I

Lynchburg, VA
 

Project Description:

Grading and site utilities for a multi residential development in Lynchburg, VA for PEDCOR Company.  A very compact site and hilly terrain required the installation of multiple retaining walls on the site in order to complete the grading operations and deliver the building pads. 

Project Cost: $3 Million

 
Vulcan Materials Overburden Removal

Danville, VA

Project Description:

Mass Excavation of overburdern material for the Vulcan Quarry.


Project Cost: $1 Million
 





 

Rocky Pen Reservoir Dam Excavation & Foundation Preparation

Stafford County, VA

Project Description:

This project consisted of 300,000 CY of regular excavation and 100,000 CY of blasting and rock excavation along with foundation preparation for a Roller Compacted Concrete Dam that, when complete, will form the Rocky Pen Reservoir.  This reservoir will have a surface area of greater than 600 acres.

Project Cost: $8.1 Million

Design Engineer: URS Corporation

Project Engineer:  Schnabel Engineering

Owner:  Stafford County


Intake Phote
Rappahannock River Intake & Pump Station

Stafford County, VA

Project Description:

Excavation and installation of the Rappahannock River Intake & Pump station that will draw water from the Rappahannock River that will then be pumped into the Rocky Pen Run Reservoir.

Project Cost: $4.7 Million

Design Engineer: URS Corporation

Project Engineer:  Schnabel Engineering

Owner:  Stafford County



Sam's Club
Danville, VA

Project Description:

Acting as a subcontractor for John S. Clark Company, Haymes Brothers, Inc. was awarded the site package for the San's Club in Danville, VAAlong with a demanding schedule to have the site prepared the building pad completion was dependent on the installation of 30,000 square foot of retaining walls.  The project was delivered on schedule.

Project Cost: $2.5 Million


Collins Drive Bridge

Danville, VA

Project Description:

Construction of a new bridge over Sandy Creek for the City of Danville, VA.  The bridge is 200 feet long and serves a vital artery to a new shopping center.

Project Cost: $1.1 Million


 
Eastern Guilford High School
Gibsonville, NC

Project Description:

Barnhill Contracting selected Haymes Brothers to do the grading and site work for the new Eastern Guilford County High School.  The original school was burned and to get students back in the school, a temporary site had to be graded for the installation of mobile classroom units.  Once this was completed the site was graded for the construction of the new school.

Project Cost: $3.5 Million


 


Amcor PET Packaging
Wytheville, VA

Project Description:


Haymes Brothers, Inc. was contracted contracted by Clayco, Inc.  to complete the site grading for a 713,000-square-foot PET blowmolding plant for Amcor in Wytheville, Va. Dedicated to the supply of PepsiCo heat set containers, primarily for Gatorade, the plant was constructed next to a recently constructed PepsiCo facility.

Project Cost $3.2 Million

 


 

Route 58 Bypass
Danville, VA


Job description:

This project actually consisted of two projects.  The first was grading and excavation of 1.7 Million CY of excavation and twin bridges across the Dan River 1,800 feet long each.

Project Cost: $22 Million

The second part consisted of 2.5 Million CY of excavation 7 overpass bridges.

Project Cost $25 Million

 


Under Construction
Under Construction
Under Construction

 

 

 

 

 

 

 

Call 434-432-8282 for a free consultation!
 

Haymes Brothers, Inc.
440 Hawkins Road / Chatham, VA
T: 434-432-8282 / F: 434-432-2029 / E-mail: info@haymesbrothers.com