Location | Ridgeway, VA |
---|---|
Owner: | Crown Cork Seal |
Project Description: | |
Site prep of a 34 acre site for a manufacturing plant. Work included installation and maintenance of erosion control measures, 4,600LF of storm drain, installation of storm water filtration system, blasting and excavation of approximately 100,000 CY of rock, fine grade of building pad. |
Project Photos